Poseidon Nickel (ASX:POS) considers plant upgrades following scoping study

Poseidon Nickel (POS) is floating the prospect of upgrading two nickel plants after determining the upgrades would be relatively low in cost and take six months to complete.

The results stem from a scoping study undertaken by POS to determine the estimated costs for refurbishing two processing plants at the Black Swan Project 50 kilometres northeast of Kalgoorlie.

Read More

crossmenu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram